




Haft Bagh Alavi National Tourism Route
For making the project operational, the first 28 kilometers of the expressway has been designed, built and paved, including a hike & bike track and horse-carriage ride lane.
Haft Bagh Alavi Project specifications
-An expressway of 26. Kilometers length including hike & bike track ,plus horse- carriage lane. A vast area of decorative plantation and trees .
-2000 Villas on both sides of the expressway in two types ((A and B)) which have been sold in cash and financing systems.
-17 pieces of business type lands with total area of 3375 sq. meters.
-70 gardens (park-shape) accessible thought side-roads which is divided to 60 villas of 1687.5 sq. Meters, in two types A and B with ownership documents (deed’s).
-The project has obtained power ,electricity ((electricity)) water and gas facilities .
-Pressurized Irrigation system for 700 acres of decorative plantation and greeneries .
For making the project operational, the first 26 kilometers of the expressway has been designed, built and paved, including a hike & bike track and horse-carriage ride lane.
Haft Bagh Alavi Project specifications
-An expressway of 26. Kilometers length including hike & bike track ,plus horse- carriage lane. A vast area of decorative plantation and trees .
-2000 Villas on both sides of the expressway in two types ((A and B)) which have been sold in cash and financing systems.
-17 pieces of business type lands with total area of 3375 sq. meters.
-70 gardens (park-shape) accessible thought side-roads which is divided to 60 villas of 1687.5 sq. Meters, in two types A and B with ownership documents (deed’s).
-The project has obtained power ,electricity ((electricity)) water and gas facilities .
-Pressurized Irrigation system for 700 acres of decorative plantation and greeneries .